pavimento en concreto de espesor de 0,3 para bodegas y patio de contenedores
dc.contributor.advisor | manuel fernado van kan | |
dc.contributor.author | albeiro murillo moreno | |
dc.date.accessioned | 2023-04-28T18:28:39Z | |
dc.date.available | 2023-04-28T18:28:39Z | |
dc.date.issued | 2022-10-12 | |
dc.identifier.uri | https://repositorio.unipacifico.edu.co/handle/unipacifico/758 | |
dc.description.abstract | RESUMEN El patio para almacenamiento de contenedores que se construye en sociedad puerto industrial aguadulce pretende dar cavidad a aproximadamente 50 contenedores para realización de operaciones portuarias y almacenamiento de mercancías; esto debido a que AGUADULCE está experimentando un aumento en la recepción de las mismas y se hace necesario tener el espacio requerido para facilitar la movilización de la carga, en operaciones internas de ordenación y control de dichas mercancías necesarias para mejorar la eficiencia de las operaciones asociadas a la carga y descarga en los buques. La empresa ARKING S.A.S está a cargo de la construcción de este proyecto con todas las herramientas, materiales, personal necesario como ingenieros, arquitectos, maestros de obras, auxiliares, tecnólogos, agentes de interventoría, que conforman equipo altamente capacitado para así llevar a cabo el proyecto. En la realización de la obra se ejecutaron actividades tanto técnica como administrativa el cual se llevó a cabo unos procedimientos para el avance de dicha obra. Para la ejecución de las actividades técnica se lleva a cabo una serie de requisitos para construir un trabajo ejemplar. Actividades como: Seguimiento del proceso constructivo de las formaletas, Seguimiento de la fundición de losa, fundación de los pavimento, sellado del pavimento en los Seguimiento del acabado de la superficie esta se realiza Una vez que el concreto se encuentre en un estado plástico, se realiza una revisión para ver la compactado y asegurarse de que no haya irregularidades en la superficie de la losa colocando una regla de 2 metros y medio de forma paralela y que las lecturas no se pasen más de los 5 mm según lo dice el Art 500 norma INVIAS. Después de esta actividad, se finaliza con el embellecimiento de todos los bordes, tanto las juntas y la losa, procedimiento el cual se realiza con llana, y se complementa el trabajo con las actividades administrativas. Palabras claves: cemento, esplanada, pavimento, concreto. ABSTRACT The container storage yard that is being built by the Aguadulce Industrial Port Company aims to accommodate approximately 50 containers for port operations and merchandise storage; This is due to the fact that AGUADULCE is experiencing an increase in its reception and it is necessary to have the space required to facilitate the mobilization of cargo, in internal operations of organization and control of said merchandise necessary to improve the efficiency of the associated operations. loading and unloading on ships. The company ARKING S.A.S is in charge of the construction of this project with all the tools, materials, necessary personnel such as engineers, architects, master builders, assistants, technologists, inspection agents, who make up a highly trained team to carry out the project. Project. In carrying out the work, both technical and administrative activities were carried out, which carried out procedures for the advancement of said work. For the execution of the technical activities, a series of requirements are carried out to build an exemplary work. Activities such as: Follow-up of the construction process of the forms, Follow-up of the casting of the slab, foundation of the pavement, sealing of the pavement in the Follow-up of the surface finish, this is carried out Once the concrete is in a plastic state, it is carry out a review to see the compaction and make sure that there are no irregularities on the surface of the slab by placing a 2.5 meter rule parallel to it and that the readings do not exceed 5 mm as stated in the Art 500 standard YOU INVITE After this activity, the embellishment of all the edges, both the joints and the slab, is completed, a procedure which is carried out with a trowel, and the work is complemented with administrative activities. Keywords: cement, esplanade, pavement, concrete | |
dc.format.mimetype | application/pdf | spa |
dc.title | pavimento en concreto de espesor de 0,3 para bodegas y patio de contenedores | |
dc.type | Trabajo de grado - Pregrado | spa |
dc.contributor.researchgroup | no aplica | spa |
dc.description.degreelevel | Pregrado | spa |
dc.description.degreename | Tecnólogo(a) en Construcciones Civiles | spa |
dc.description.researcharea | Urbana | spa |
dc.subject.proposal | cemento, esplanada, pavimento, concreto |